At a glance
Operator: Alibaba Cloud
Documented status: Operating facility documented in the government case study; latest installed load not disclosed
What the sources establish
The Ministry of Industry and Information Technology’s March 2021 case study identifies Alibaba’s Miaotan facility in Zhangbei and reports approximately 4,000 racks, space for 100,000 servers and an annual average PUE of 1.19. It describes air-handling-unit fan walls, high-voltage direct-current power distribution and heat-recovery measures. MIIT: Alibaba Zhangbei Miaotan green data center case
The disclosure is useful because it treats efficiency as a combination of cooling, power conversion and resource reuse. An international reader can examine the engineering choices without assuming that a similar climate will reproduce the same operating result.
Why it matters for infrastructure delivery
Zhangbei offers a facility-level view of how a northern location can interact with electrical and mechanical design. The delivery question is how those systems perform together at the actual IT load. Seasonal temperature, equipment loading and maintenance settings should be included in any comparison of annual efficiency.
The PUE figure is meaningful as a dated operating disclosure. It should not be converted into AI throughput or used to infer the number of accelerators currently installed. A commercial assessment would still require a defined computing workload and an accepted service configuration.
Evidence and comparison limits
The rack and server figures describe the scope of the 2021 case study. They do not establish 2026 occupancy, GPU inventory, available capacity or the efficiency of every Alibaba facility in Zhangbei.
What to follow
Look for newer facility-specific energy measurements, phased expansion disclosures and workload-level performance evidence.
Original information and official project sources
Open the underlying operator material, public-authority disclosure or certification register below. Source dates and reporting periods are separate from this profile’s publication date.
MIIT: Alibaba Zhangbei Miaotan green data center case ↗Source date / reporting period: 2021-03-05 · Reviewed 23 October 2026